Sewer
Sanitary drainage on the house, from the stack to the rooms it serves. This Bateau Bay job renewed an old external stack to 100mm PVC and redesigned the run for a new bathroom, powder room and laundry.





Jobs by suburb
- Bateau Bay: The old external sewer stack was renewed to 100 mm PVC and redesigned to serve a new bathroom, powder room and laundry, as part of a three-room renovation.
- Kahibah: The drainage was renewed for a bathroom we worked on, with new pipework under the floor.
- Summerland Point: Stack drainage, drains and rough-in for a double-storey extension and renovation.
- Wyee Point: A new floor waste and drainage set in the open floor during a bathroom renovation.
Got a similar job?
Request a callback and Josh will talk through the work before anything starts.








