Skip to content

Pumps & Filtration

Low street pressure, rusty tank water, or a house that wants drinking-quality at every tap. We fit mains-pressure pumps and pressure vessels, then the filtration train: multi-stage cartridges, UV sterilisation and a bypass manifold so the house can stay on while the filters are changed. Coppered, labelled, tested. A recent job on Instagram is the whole setup in a garage, pump, vessel, UV and bypass on one wall.

What's included

  • Mains-pressure / booster pumps
  • Pressure vessels and controllers
  • Whole-home multi-stage filtration
  • UV sterilisation
  • Bypass manifolds and isolation
  • Potable labelling and commissioning
  • Filter changes and pump service
  • Quoted off the supply, not a catalogue
Whole-home filtration, UV sterilisation, mains-pressure pump and pressure vessel on copper.

Indicative pricing

$2,800–$8,500

A market-typical guide, not a quote. Your exact price for the job is confirmed in writing before any work starts.

See the full price guide

Licensed & insured

Every job is carried out by Josh, a licensed plumber and gas fitter (Donza Plumbing Pty Ltd, ABN 51 697 209 153), and certified to AS/NZS 3500 plumbing & AS/NZS 5601 gas.

Gas FittingFully insuredUpfront quotes

Servicing

On the tools

The finished copper manifold: mains-pressure pump, pressure vessel, multi-stage cartridges and UV, potable labelled.
The finished copper manifold: mains-pressure pump, pressure vessel, multi-stage cartridges and UV, potable labelled.
Pressure vessel, pump, multi-stage filters and UV, isolation valves throughout.
Pressure vessel, pump, multi-stage filters and UV, isolation valves throughout.
BWT UV20 steriliser over twin filter housings, teed off the copper bypass.
BWT UV20 steriliser over twin filter housings, teed off the copper bypass.
Filtration, UV and the mains-pressure pump set out along the garage wall.
Filtration, UV and the mains-pressure pump set out along the garage wall.
The finished whole-home setup, seen from the garage door.
The finished whole-home setup, seen from the garage door.
Mains-pressure pump and pressure vessel, isolation valves and potable labels.
Mains-pressure pump and pressure vessel, isolation valves and potable labels.
Stainless UV sterilisation chamber, ready to go on the manifold.
Stainless UV sterilisation chamber, ready to go on the manifold.
Multi-stage cartridges and the stainless UV chamber, laid out before the wall mount.
Multi-stage cartridges and the stainless UV chamber, laid out before the wall mount.

How the job runs

What to expect, start to finish.

  1. Look at the supply

    Street pressure, tank, bore, existing pipework. Photos get us a long way; a site look confirms the pump size.

  2. Set the train

    Pump and vessel first, then filtration and UV, with a bypass so the house stays on for service.

  3. Copper and commission

    Manifold clipped, labelled potable, pump controller set, UV lamp proven, joints tested.

  4. Handover

    How to isolate, when to change cartridges, and a number to call when the lamp is due.

Good to know

Pumps & Filtration FAQs

Is this for town water, tank water or a bore?

All three. Town water that arrives soft and then dies at the shower gets a mains-pressure pump and vessel. Tank and bore supplies usually want filtration and UV as well, because the pump is only half the job. We look at the supply before we quote the train.

What does a typical whole-home setup include?

A booster or mains-pressure pump, a pressure vessel so the pump is not short-cycling, two or three filter housings, a UV chamber, and a bypass with isolation valves so you can change cartridges without shutting the house down. Copper manifold, potable labels, tested before we leave.