Bathroom Renovation Plumbing
The work Donza is best known for. We handle the plumbing side of a bathroom renovation end to end: drainage set-out and core holes through slab, in-wall cistern and bath rough-ins, laundry and powder-room runs, then back for the fit-off once tiling is done. Accessibility and NDIS bathrooms are part of that work, quoted against the drawings before the room is stripped. We work in with your builder and tiler, and after enough bathrooms together we can also bring trades we already trust.
What's included
- Rough-in & fit-off, set out on site
- In-wall cisterns & freestanding baths
- NDIS and accessibility set-outs
- Core holes through suspended slab
- Works in with your builder & tiler
- AS/NZS 3500 compliant

Licensed & insured
Every job is carried out by Josh, a licensed plumber and gas fitter (Donza Plumbing Pty Ltd, ABN 51 697 209 153), and certified to AS/NZS 3500 plumbing & AS/NZS 5601 gas.
Servicing
On the tools

























How the job runs
What to expect, start to finish.
Scope & set-out
Site visit against the new layout, fixture positions agreed with your builder and tiler, fixed price in writing.
Rough-in
Drainage, water and gas runs set with a laser while the room is stripped, core holes drilled where the slab needs them.
Fit-off
Back after tiling for tapware, toilet, bath and vanity connection, tested and left clean.
Certify
Work certified to AS/NZS 3500, with the paperwork your builder or certifier needs.
Good to know
Bathroom Renovation Plumbing FAQs
Do you do the whole renovation or just the plumbing?
The plumbing, end to end. Demolition, tiling and cabinetry belong to their trades; our job is everything water and gas touches, from the first drainage set-out to the final tapware fit-off. We work in with the builder and tiler you already have, and if you are starting from scratch we can point you to crews we have finished bathrooms alongside.
Can you move the toilet, shower or vanity to a new spot?
Usually yes, and it is the most common reason a renovation needs a plumber early. Moving fixtures means new drainage falls and sometimes core-drilling through slab, which we scope and price before demolition starts, so there are no surprises once the floor is open.
When should the plumber get involved in a renovation?
Before demolition. The rough-in has to be planned against the new layout, and quoting it off the finished drawings, not mid-demo, is what keeps the price fixed. We do a site visit, agree the set-out with your builder or tiler, rough in once the room is stripped, and come back for fit-off after tiling.
Related services
Hot Water Systems
Install, relocate, repair and replace gas, electric, heat-pump and continuous-flow hot water units, with the old unit taken away.
Gas Fitting & Gas Appliances
Gas leak detection, line installation, cooktop and heater connection, gas hot water and compliance certificates, the work plumbing-only operators can’t legally do.
Blocked Drains & Stormwater
Clearing blocked sinks, toilets and sewers, high-pressure jetting, CCTV camera inspections, tree-root cutting, pipe relining and stormwater drainage.

